Projects
WARTSILA – CCL MIRACLE
Prefabrication and installation of modifications to the filter pump system, including rewiring. Vent rerouted to deck. Replacement of defective valves.
Queen Victoria
Prefabrication and installation of modifications to the sewage treatment system. Includes assembly of new control panels.
Queen Elisabeth
Prefabrication and installation of modifications to the sewage treatment system. Includes assembly of new control panels
Carnival Victory Dry-dock
Steel prefabrication and block assembly.
Carnival Triumph Dry-dock
Waterpark fabrication and istallation.
Carnival Triumph Dry-dock
Steel prefabrication and installation onboard.
Pile Cleaning Tool
Pile Placement Subsea.
Oss East Anglia 1
Offshore Substation.- Manufacture of Grillage and Rigging system for transport.
SAIPEM S-7000
Manufacture of Active Hive Compensator telescopic Gangway.
Disney Wonder
Repair and maintenance of lifeboats. Repair of Systems in Ship.
PL’s Refurbishment
Custody, Repair Steels and Maintenance Hydraulic and Control Systems.
OSS Wikinger
Technical Assistance to the Installation and Anchoring.
OSS Wikinger
Offshore Substation- Prefabrication and sub modules.
ROV’S
Repair and Maintenance of Hydraulic and Control Systems.
SAIPEM S44
Grillage Barge S44 to Project Mariner.